NHON TRACH 1 INDUSTRIAL PARK

NHON TRACH 1 INDUSTRIAL PARK – DONG NAI

Nhon Trach 1 Industrial Park
Nhon Trach 1 Industrial Park

I. OVERVIEW OF NHON TRACH 1 INDUSTRIAL PARK

Nhon Trach 1 Industrial Park in Nhon Trach new urban area is located in the planning of an industrial city with a scale of 8,000 hectares, including a system of airports, ports, industrial parks, residential planning areas, and entertainment areas. intelligence…

Convenient transportation by road, waterway, and air, the Industrial Park is far from the city. Ho Chi Minh 45km, City. Bien Hoa 40km, City. Vung Tau 60km… The area has a temperate climate (20-30oC), no storms and earthquakes, high soil load bearing intensity (1.5-2.5kg/cm2), so it saves costs and is convenient for Deployment of production factory construction.

Currently, the Industrial Park has been chosen by many investors from Korea, Taiwan, Switzerland, Malaysia, France, America… to invest in developing manufacturing factories..

 

II. INFRASTRUCTURE OF NHON TRACH 1 INDUSTRIAL PARK

Land use planning map of Nhon Trach 1 Industrial Park
Land use planning map of Nhon Trach 1 Industrial Park 

 

See more: 20 remarkable Industrial Parks in Vietnam

 

Power supply:

– Power supply: The industrial park is supplied with power from Tuy Ha 110/22KV Transformer Station, capacity of 182MVA managed and operated by IDICO Housing and Urban Development Investment Joint Stock Company (IDICO-UDICO).

– Tuy Ha 110kV transformer station is connected and supplies 110kV power from the National Power System through Long Binh 220/110kV transformer station with a stable power source, ensuring quality. – Voltage supply to factories : 22kV

– 22kV electricity unit price does not include VAT (according to State regulationsDecision 648/QD-BCT dated March 20, 2019):
+ Normal hours:1.555VND/kWh
+ Peak hours:2.871VND/kWh
+ Off-peak hours:1.007VND/kWh

Water supply:

– Water supply source: Factories in the Industrial Park are supplied with water from Tuy Ha underground water plant with a capacity of 22,000m3/day and night provided by Investor IDICO-URBIZ.

– Water price according to regulations of Dong Nai province.

 

Communications:

The communication system is provided by network operators such as: VNPT, FPT, Viettel… ensuring smooth domestic and international communication. Includes full services such as: telephone, mobile phone, Fax, Internet…

Drainage:

Including: Rainwater drainage system and wastewater drainage system are planned and built separately, running along internal roads to ensure collection of all rainwater and wastewater from factories in the industrial park.

– Rainwater is drained directly into the receiving source.

– Wastewater is collected to the centralized wastewater treatment station of the industrial park and thoroughly treated, meeting required standards before being discharged into the environment.

Wastewater treatment:

The centralized wastewater treatment plant located in Nhon Trach 1 industrial park has a treatment capacity of 6,000m3/day and night. Currently, IDICO-URBIZ is implementing investment procedures to renovate and upgrade the wastewater treatment plant to 10,000m3/day and night.

Traffic inside and outside the Industrial Park:

* Road: Nhon Trach 1 Industrial Park is located in the center of the southern key economic region including Ho Chi Minh City – Bien Hoa – Vung Tau, convenient for road and waterway transportation.

The road system includes: Road 25B connecting with National Highway 51 to City. Ho Chi Minh (50km), go to Bien Hoa (40km), go to City. Vung Tau (60km)

* Waterway:

Nhon Trach Industrial Park 1 way:

– Saigon Port 48 km.

– Vung Tau Port 60km.

– Phu My Port 22km (Ensured for ships of 72,000 tons to dock and load and unload containers and oversized and overloaded machinery and equipment).

– Go Dau Port 15km (Ensured for ships of 15,000 tons to dock and load and unload containers, goods and machinery equipment)

SEE MORE INFORMATION